Follow us on

 

Febuary 2009

A great deal of work goes into keeping these warbirds flying.

  1. Main wheel bearing cleaned and repacked.
  2. Brakes checked.
  3. Wing fairings removd to check for corrosion. All OK!
  4. Main right fuel tank pulled and checked.
  5. Floorboards pulled and cables checked and serviced.
  6. Bladder in the hydraulic accumulator replaced.

Thanks again to Terry Swann for the photos.

Douglas C-47

Douglas C-47

Douglas C-47

Douglas C-47

Douglas C-47

BACK to Restorations

Top of Page